Recently, a new vertical lifting HZS180D mixing plant ordered by a highway engineering company in Boxing County, Binzhou was put into operation successfully with the cooperation of customers and service personnel.
This plant is the 50th anniversary of the new vertical-lift-type mixing plant. The hoisting system of this type of mixing plant continues to adopt the double-rope hoisting method, but the hoisting method is changed to the straight hoisting, which effectively shortens the loading time and reduces the friction between the roller and the track in weighing, and the time has ushered in the efficiency promotion, the cost of maintenance is greatly reduced due to the reduction of friction, the voltage and current feedback instruments are added to the main operating parts. This product is also in a number of prototype as a “bright spot. “. We received customers from Binzhou, who showed great interest in our vertical lift mixing plant, signed the contract and said they wanted our prototype. In early September to the mixing plant is in the hands of customers, now, high-quality concrete has been put into the local road construction.
FYG’s modular concrete mixing plants are designed for minimum space requirement and large quantities of concrete production performance, durable container modules enable economical transportation, minimum time and operations of erection and disassembling, robust structure reduces the requirement of foundation, leading to economical plant relocations, plant fully enclosed and protected from harsh environment, also low noise and dust emission.