July 31, 2023 FYG HZS90 modular container-design mixing plant has been commissioned in Sudan, to support construction of the second phase expansion project of the storage yard of the Sudan port.
FYG’s HZS90 container mixing plant serves the second phase expansion project of the storage yard after the new container berth in Port Sudan. The project includes 3 heavy container yards, 2 empty container yards, and vehicle areas, covering a total area of 350,000 square meters.
FYG’s modular concrete mixing plants are designed for minimum space requirement and large quantities of concrete production performance, durable container modules enable economical transportation, minimum time and operations of erection and disassembling, robust structure reduces the requirement of foundation, leading to economical plant relocations, plant fully enclosed and protected from harsh environment, also low noise and dust emission.