Skip to main content

FYG HZS180D modular mixing plant support the construction of the Urumqi around-city high-speed project

June 21, 2021 One FYG HZS180D modular container-design mixing plant has been commissioned in Urumqi, Xinjiang autonomous region, to support the construction of the Urumqi around-city high-speed project.

The main line of the project is 92.027 km long and is constructed according to the standard of two-way eight-lane expressway. The design speed is 100 km/h, and the width of the roadbed is 41 meters, and the construction period is 3 years.

FYG’s modular concrete mixing plants are designed for minimum space requirement and large quantities of concrete production performance, durable container modules enable economical transportation, minimum time and operations of erection and disassembling, robust structure reduces the requirement of foundation, leading to economical plant relocations, plant fully enclosed and protected from harsh environment, also low noise and dust emission.