Skip to main content

FYG HZS180 modular mixing plants support the construction of the Xiongshang high-speed railway

April 15, 2021  Multiple FYG HZS180 modular container-design mixing plants have been commissioned in Heze, Shandong Province, to support the construction of the Xiongshang high-speed railway.The Xiongshang high-speed railway project has a total length of 552.547 km,with a design speed of 350 km/h, a total investment of 81.08 billion yuan, and the construction period of 4 years.

FYG’s modular concrete mixing plants are designed for minimum space requirement and large quantities of concrete production performance, durable container modules enable economical transportation, minimum time and operations of erection and disassembling, robust structure reduces the requirement of foundation, leading to economical plant relocations, plant fully enclosed and protected from harsh environment, also low noise and dust emission.