Skip to main content

Commission of three HZS180 modular mixing plants for high-speed railway construction project northeast China

August 24, 2021 Three FYG HZS180 mixing plants started producing high-quality concrete in Shenyang-Baihe high-speed railway construction project.

The Shenyang-Baihe high-speed railway project is an important part of the national mid-and long-term railway network northeast China. The construction of this project will carry out the “Belt and Road” in the region, and it is of great significance to promote the effective integration of regional development and national strategies. The length of the main line of this project is 428.811 km, the running speed is 350km/h.

FYG’s modular concrete mixing plants are designed for minimum space requirement and large quantities of concrete production performance, durable container modules enable economical transportation, minimum time and operations of erection and disassembling, robust structure reduces the requirement of foundation, leading to economical plant relocations, plant fully enclosed and protected from harsh environment, also low noise and dust emission.